Product Development

Development is where cost, timeline, and quality are decided. Everything after it is execution. MakeMine builds the specification your factory needs, whatever the product is: a tech pack for a garment, a formula and fill spec for a skincare line, a construction and hardware spec for a bag.

Book an Intro Call

A factory will never tell you your specification is incomplete

Factories quote against the document you send them. When that document has gaps, nobody stops and asks. They fill the gaps with whatever is already in the building: a stitch type they run every day, a stock jar their line is tooled for, a hardware finish they happen to have. Then they quote against those assumptions.

You find out in sample round three, or in the first stability test, or when the first pallet lands. By then the assumption has become the product.

Development is the cheapest place in the process to change your mind. Every stage after it charges you more for the same decision.

What development covers

Specification build or audit

Built from your sketches, references, and reference products, or audited if you already have a pack or a formula, against what a factory actually needs to quote rather than estimate.

Bill of materials

Every material, component, and consumable specified with supplier, finish, and consumption per unit.

Dimensional and performance spec

The measurements, tolerances, and performance criteria that define what "correct" means at inspection, rather than leaving it to judgment.

Component and material sourcing

Fabric, hardware, containers, closures, and packaging matched to suppliers who can hold your volume and your lead time.

Artwork and decoration

Print, embroidery, label, and applied-graphic files prepared to production format, with placement measured from a fixed point.

Regulatory scoping

The labeling, testing, and documentation your category requires, identified before the specification is locked. See Quality & Compliance.

Costing review

What your specification will cost to make, with the drivers broken out, before you commit to it.

Factory matching

Your product routed to the facility in the MakeMine network that does that construction or process best, not the one with open capacity.

How development runs

Five steps from intake to a costed specification, matched to the factory that will build it.

Typical duration
  1. Intake

    2–3 days

    You send designs, references, sample products, measurements, and anything you already have. MakeMine identifies what's missing.

  2. Specification

    1–3 weeks

    Spec, bill of materials, and tolerances built out to factory-ready standard. Formulated products run longer here, because bench work sits inside this step.

  3. Review

    3–5 days

    You review. Material, construction, and process decisions are resolved here rather than in sampling.

  4. Factory match

    2–4 days

    Routed to the right facility on construction, process, volume, and target cost.

  5. Costing

    1–2 weeks

    The factory quotes against a complete spec. Cost drivers are broken out so you can see which one to move.

What a factory needs before it can quote, by category

The document has a different name in every category. The job is identical: remove every decision the factory would otherwise make on your behalf.

CategoryWhat the specification is calledWhat it has to contain
ApparelTech packFlat sketches, points of measure with tolerances, size grading, bill of materials, construction callouts, colorways, artwork placement, label spec
AccessoriesTech pack or construction specDimensional drawings, material and hardware spec with finish, construction and edge detail, lining, branding placement
Personal careFormula, fill spec, and component specFormula with use levels, fill volume and viscosity, primary container and closure, decoration method, claim substantiation, label copy
Every categoryPackaging specPrimary, secondary, and shipper dimensions; material and print method; barcode symbology and placement

A factory quoting from less than this is estimating. The number moves once the real specification arrives, and it moves in one direction.

What a complete specification contains

ComponentWhat it specifiesWhy the factory needs it
Bill of materialsEvery material and component with supplier, finish, and consumptionDrives most of your unit cost and every material lead time
Dimensional specEach measurement point with its toleranceDefines what passes inspection and what doesn't
Construction or process detailOperation-level method, equipment, and finishDetermines machine allocation, labor minutes, and batch size
Color and finish standardsAn approved physical or Pantone reference per componentPrevents mismatch between components made by different suppliers
Artwork filesProduction-format vector files with measured placementRequired for tooling, screen, plate, or digitizing setup
Packaging and label specPrimary pack, carton, and every legally required label elementLegally required content has to be specified, never assumed
Performance criteriaThe tests the product has to passTurns "quality" into a measurable result rather than an opinion
Volume and variantsQuantities per SKU and per variantDetermines which minimums bind and which don't

What MakeMine will tell you in development

  • If your target cost and your specification are incompatible, we tell you which one has to move, before we quote rather than after.
  • If your construction or process requires equipment none of our factories run, you hear it in development, not after a failed sample.
  • If your volume is below the minimum for the material, component, or formula you've specified, we say so and show you what changes.
  • The specification MakeMine develops is yours. It goes with you, including to another manufacturer. A spec you don't own is a spec you can't take to a second factory for a competing quote, which quietly locks you to one supplier.

Frequently asked questions

What does product development mean in manufacturing?

It is the work of turning a concept into a specification complete enough that a factory can quote and build it without guessing. That means a bill of materials, dimensional or fill criteria with tolerances, construction or process detail, artwork prepared to production format, and the labeling your category legally requires. It is not design, and it is not sampling. It is the document set that sits between them.

Do I need a specification before contacting a factory?

You need one before you can get a reliable quote. Factories will respond to a sketch or a reference product, but the number they return is an estimate that moves once the real specification arrives. Developing the spec first means the quote you receive is the price you pay.

How long does product development take?

Three to six weeks from intake to a costed, factory-matched specification for most non-formulated products. Timeline depends on how complete your starting materials are and how many decisions remain open. Formulated personal care runs considerably longer, because bench development and twelve weeks of stability testing sit inside the same window.

Can MakeMine develop from sketches or an existing product?

Yes. Development starts from hand sketches, digital design files, a reference product you want matched or improved, or an existing pack or formula that needs bringing to factory standard. Most brands arrive with some combination, and development consolidates them into one specification.

I already have a tech pack or a formula. Do I still need development?

Usually as an audit rather than a rebuild. The common gaps are tolerances that were never set, a bill of materials without suppliers or consumption, artwork in the wrong format, and label content that hasn't been checked against the regulation for the category. Those are cheap to close before quoting and expensive to close after sampling.

Who owns the specification MakeMine develops?

You do. It is your specification, and it goes with you, including to another manufacturer. That matters more than it sounds, because a specification you don't own is one you can't take elsewhere for a competing quote.

Does this work the same way outside apparel?

The document changes; the discipline doesn't. An apparel program needs points of measure and grading. A personal care program needs a formula, fill parameters, and a component that the formula is compatible with. An accessory needs hardware finish and dimensional drawings. In every case the job is to close the decisions before a factory closes them for you.

Decide it now, or pay for it later.

Send what you have: sketches, a reference product, an existing pack or formula. MakeMine will tell you what's missing before you spend a dollar on samples.